Projects

Browse through our projects here or use the site's search function to find examples related to your requirement..

 

Advice for Historic Vessel, HMS President

Access Feasibility Study

HMS President is moored in Central London next to Blackfriars Bridge.The Aschusa Class sloop was built in 1918 as a convoy protection vessel in the First World War. It was disg...
read more >>

Supporting the Royal Fleet Auxillary's Replenishment at Sea (RAS) Capability

Acquisition Support, Equipment Specification, Integration Design, Trials and Set to work

Cammell Laird Shipyard engaged Houlder to specify, procure, support the installation, commission and provide training for a 3 tonne SWL fuel hose handling crane on ...
read more >>

Telescopic Arms for Semi-Submersible Rigs

Design, Structural Analysis, Construction Supervision and Offshore Installation

Houlder won the contract to design, develop and fabricate four Telescopic Arms for Aker Kvaerner’s two Aker H-6e Semi Submersible rigs. The telescopic arms were manufactur...
read more >>

Shipyard Audit for Construction of Windfarm Installation Vessel

Risk, Quality, Health & Safety and Capacity Evaluation

Houlder acted as Shipyard Auditors for the charterer's of a new build Windfarm Installation Jack up vessel. Specifically Houlder evaluated the location, facilities, block sizes,...
read more >>

Pipelay Conversion of Subsea Vessel

Detailed Design

Houlder enabled this 150m DP2 pipelay and subsea construction ship to flexlay up to 340 tonnes in water depths of up to 2000m through a detailed conversion design programme. Wor...
read more >>

Feasibility Study for Well Stimulation Conversion

Front End Engineering Design (FEED)

Houlder was asked to assess the feasibility of converting a platform supply vessel into a Well Stimulation vessel. The resulting vessel will be capable of performin...
read more >>

Telescopic Arms on 5th Generation Semi-submersible Rig

Design, Fabrication, Installation and Commissioning

Houlder continued its partnership with specialist contractors Subsea Services with the design and supply of telescopic arms that enable remote conenction of kill lines, choker l...
read more >>

Supporting an Iconic Vessel on the Thames

Mooring Study, Structural Analysis, Wind Loading Calculations

Houlder’s headquarters are a few minutes’ walk from HMS BELFAST, the floating museum permanently moored in the shadow of Tower Bridge.

Earlier this ...
read more >>

Feasibility Study into Offshore Infrastructure

Feasibility Study, Concept Design, Electrical & Water System Design

In response to a leading Offshore Modular Accommodation supplier looking to exploit opportunities in the offshore renewables sector, the company undertook a Feasibility Study in...
read more >>

‹ First  < 2 3 4 5 6 >